Runs for heavy load windows, and charges the battery while it is already running efficiently.
Stores the energy and sits right next to the work zone, silent and emission free.
Site office, lighting, hand tools, testing, pumps and fans, through the day and the night.
When the battery units are charged and deployed, and the generator is not needed, it gets switched off. That is where the runtime and the fuel bill fall away.
Most sites run diesel for everything, including the hours when diesel is at its worst. Move the right loads to battery and the generator runs less, burns less, costs less.
Silent, emission free, instant. It takes the long, low, unglamorous loads that a generator should never have been running.
Where a supply exists, we use it properly: charging overnight on cheaper demand, and shaving the peaks that inflate your bill.
Still the right answer for genuine peaks and long heavy plant duty. Kept, sized correctly, and run a fraction as often.
The generator does not leave your site on day one. It stops running for eighteen hours to deliver four hours of useful work. That single change is where most of the saving lives.
Size my site →When the battery units are charged and deployed for site works and the genset is not required, it can be switched off entirely.
Power sits beside the work zone instead of being dragged from one distant source, cutting trip hazards and setup time.
No local fumes from the battery unit and lower noise exposure in residential, indoor or controlled areas.
It was the cable. Long runs from one supply point, laid and protected and moved again next week, with an electrician booked before anyone can start.
The unit goes where the tools are. Basement, deck, tunnel, beside the gondola.
| Diesel only | Hybrid with BESS | |
|---|---|---|
| Fuel burned on low loads | High | Far lower |
| Generator runtime | Long hours | Cut right back |
| Cable pulled across site | Up to 50 m | At the work face |
| Refuelling and disruption | Frequent | Rare |
| Total cost on a modelled site | Baseline | 40 to 70% less |
On a modelled six-storey site drawing about 60 kW for 10 hours a day, a hybrid EH-One+ and EH-Cube+ deployment came out roughly 40 to 50 per cent below the total cost of a 125 kVA diesel generator set, and avoided around 223 tonnes of CO₂ a year. On sites where the generator is badly oversized for the actual load, which is most of them, we have seen savings reach as high as 70 per cent. Your figures depend on your own load profile, which is exactly why we start with one.
You are buying the integration, not the box.
What you need to power, for how long, how often, and under what site constraints. A call, then a site visit where it matters.
A written recommendation covering configuration, capacity, runtime, charging strategy, footprint and options. Clear enough to take to your own stakeholders without translating it.
Configured, assembled and tested at our facility. Documentation prepared alongside the build, not after it.
Positioned, connected, tested on load and signed off on site, with your operators trained before we leave.
Local spares, servicing and engineering escalation. One number, and a team that already knows your configuration.
When the next project needs more, the same design and support model extends to it, backed by GoRental Global deployment capability.
Tools, lighting, communications and small-site operations.
Learn more →Events, mobile operations and temporary work areas.
Learn more →Food trucks and rooftop operations.
Learn more →Industrial loads, backup power and extended-duration operations.
Learn more →Large-scale industrial power, peak-demand management and site-wide energy support.
Learn more →An equipment list and a set of dates is enough. You get a real sizing answer from an engineer the same working day.