Trusted by the contractors and agencies building Singapore
Nobody searching for a portable genset in Singapore actually wants an engine. They want power where the mains does not reach. A mobile BESS does that without fuel, exhaust, noise or a fire permit.
Not specifications. Consequences.
Achievable on hybrid deployments.
Quiet enough for night works beside housing. No complaint, no stopped shift.
Nothing in the air at the work face. Basements, tunnels and enclosed fit-outs included.
Fleet units are charged and ready. When the dates are tight, that is the difference.
Most portable power here is bought from an overseas factory and resold with a new sticker. When it fails on a Saturday, nobody local can tell you why. The EH-Series is ours. Designed here, localised for Singapore, patent application filed April 2026.
Five systems from 5 kWh to 500 kWh. You should never change supplier because the project grew.
Tools, lighting, communications and small-site operations.
Learn more →Events, mobile operations and temporary work areas.
Learn more →Food trucks and rooftop operations.
Learn more →Industrial loads, backup power and extended-duration operations.
Learn more →Large-scale industrial power, peak-demand management and site-wide energy support.
Learn more →Six numbers from real Singapore sites. You already recognise all of them. Select a point on the site.
A genset idling to deliver four hours of useful work.
Battery takes the base load. The engine starts only when it earns its keep.
A genset idling to deliver four hours of useful work.
Battery takes the base load. The engine starts only when it earns its keep.
Of cable laid, protected, tripped over, then moved again next week.
Power arrives at the work face. No trenching, no temporary board.
One resident complaint ends the night shift you planned the month around.
Under 50 dB(A). Quiet enough that the work simply continues.
Somebody awake to refuel a machine that is not allowed to stop.
Charge overnight, run all day. Nothing to store, nobody to send.
Scored on the emissions section of a bid you were otherwise winning.
We hand you kWh delivered, litres avoided and CO₂ saved, in writing.
Basement, tunnel, gondola, third floor of a live building.
The unit goes where the tools go. Nothing is burning, so enclosed spaces open up.
What our clients told The Business Times, 18 June 2026.
“A safer and more flexible work environment for both those working on the construction projects and those living in neighbouring areas.”
“Lower emissions, reduce fuel consumption and minimise noise levels, creating cleaner and more conducive working environments for our teams and surrounding communities.”
“They offer important benefits from a safety and workplace perspective, including reduced noise, the elimination of exhaust fumes and a lower reliance on extensive cabling and temporary power infrastructure.”
So we are not asking you to. One load, one site, one month. Keep the generator. Keep the programme. Change nothing else and read the numbers yourself.
We do not sell batteries. We take responsibility for whether your site has power.
Your request is with our engineering team. You will hear back the same working day.